Steregushchy class corvette


Steregushchy on the Neva in 2009
Class overview
Builders: Severnaya, St. Petersburg
Komsomolsk Shipyard
Operators:  Russian Navy
 Algerian National Navy
Preceded by: Grisha class corvette
Succeeded by: Gremyashchy class corvette
Subclasses: Project 2038.2 Tigr (export)
Project 2038.5 (domestic)
Cost: US$120-150m (est. for Tigr)
Built: 2001 - current
In service: 2007 - current
Building: 3
Completed: 3
Active: 2
General characteristics
Class & type: FFGHM
Type: Project 2038.0
Displacement: 1,800-2,200 tons
Length: 343 ft (104.5 m)
Beam: 38 ft (11.6 m)
Draught: 12 ft (3.7 m)
Installed power: AC 380/220V, 50 Hz, 4x630 kw diesel genset
Propulsion: 2 shaft CODAD, 4 Kolomna 16D49 diesels 23,664 hp (17.6 MW)
Speed: 27 knots
Range: 3,800 nm at 14 knots
Endurance: 15 days
Complement: 90
Sensors and
processing systems:
Air search radar: Furke-E 3D, E/F band
Surface search radar: Granit Central Scientific Institute Garpun-B/3Ts-25E/PLANK SHAVE radar
Monument targeting radar
Fire control radar: Ratep 5P-10E Puma for A-190
HOT FLASH radar
Sonar: Zarya-ME suite, bow mounted. Vinyetka low frequency active/passive towed array
Navigation: GORIZONT-25 integrated navigation system
Electronic warfare
& decoys:
TK-25E-5 ECM, 4 x PK-10 decoy
Armament: 1 x Arsenal A-190 100mm
2 x MTPU pedestal machine gun 14.5 mm
1 x Kashtan CIWS-M CADS or
12x Redut VLS cells
2 x AK-630М CIWS
1x8 VL Kh-35 missiles
2x4 330mm torpedo tubes (for Paket-NK)
Aircraft carried: Hangar for Ka-27 Helicopter